How Much Is a Kitchen Remodel Permit in Doral?
How much is a kitchen remodel permit in Doral? Since October 1, 2026, the city charges flat fees by tier instead of a share of the job's value. A full kitchen takes an interior alteration permit, $685 or $1,250 depending on the tier the city assigns, plus $585 for each trade sub-permit. Add the state and county surcharges and a $75 technology fee per permit, and the total runs about $2,200 to $3,500.
Why Doral Stopped Pricing Permits by Job Value
Until this fall, a Doral permit grew with the contract. The city's own 2024 fee study priced a sample kitchen remodel, $37,470 of porcelain flooring, new lighting and new plumbing fixtures, at $2,116 under the schedule then in force. The schedule that took effect in January 2025 brought the same kitchen down to $937.
Two state laws have since ended percentage-based permit fees. House Bill 803, in force since July 1, 2026, says inspection fees "may not be based on the total cost of a project and may not exceed the actual inspection costs incurred by the local enforcement agency." House Bill 399 goes further from January 1, 2027: a city's permit application fee "may not be based on a percentage of construction costs, site costs, or project valuation."
Doral moved ahead of that deadline. Its Resolution 26-134 replaced the percentage fees with six flat tiers, each priced on what city staff spend to take in, review and inspect that kind of work. Two kitchens with the same scope now pay the same permit, whether the cabinets cost $15,000 or $60,000.
Adding Up a Kitchen Permit in Doral
This is how to calculate permit fees for a kitchen in Doral under the current fee schedule. Every permit now has three flat parts: a non-refundable intake fee, a plan review fee and an inspection fee that covers a set number of trips.
The building permit for a kitchen is an interior alteration. The city's fee table places interior alterations in Tier 3, $685 with eight inspections, and larger residential alterations in Tier 4, $1,250 with ten. The city assigns the tier when it takes in the application; the applicant does not choose it.
Each trade the kitchen touches adds a sub-permit at $585. Electrical covers new circuits and lighting, plumbing covers a moved sink or a gas line, and mechanical covers a range hood ducted outside. On every base fee the city also collects 2.5% for the state's Building Code Administrators and Inspectors Board and the Florida Building Commission, 5% for Miami-Dade's code compliance office, plus a $75 technology fee per permit.
Put together, a Tier 3 kitchen with electrical and plumbing work comes to about $2,200: $1,855 in base fees, $139 in surcharges and $225 in technology fees. A Tier 4 kitchen that also adds a ducted hood comes to about $3,500. Either way, the kitchen remodel permit cost stays a small line next to the $12,500 to $300,000+ a full kitchen remodel costs.
Costs That Come After the Permit
The flat fee assumes the job passes its inspections in the number of trips its tier allows. Anything beyond that is billed by the trip. A reinspection costs $103.73 when the inspector finds the work has not moved since the last visit, and each further reinspection of the same item costs four times the trip rate, as Florida Statute 553.80 requires.
Changing the plans after the permit is issued costs at least $300 in residential review. Starting work before the permit exists costs $100 plus a second copy of the base fee, on top of the permit itself.
None of these is large on its own. They are the part of the permit a contractor controls, by settling the plans before they go in and passing each inspection on the first trip.
Doral Runs Its Own Building Department
Doral issues its own permits from the Building Department at 8401 NW 53rd Terrace, under its own fee schedule, first adopted in 2004, so a Doral kitchen does not go through Miami-Dade's permitting office. The county still shows up on the invoice, through the 5% code compliance surcharge.
The numbers on this page belong to the schedule that took effect October 1, 2026, and they will move. Each October the city adjusts its fees by the change in the Miami-area consumer price index, up to 10% in either direction without a council vote. A quote written in September can carry a different permit line than the same kitchen permitted in November.
Where the Permit Fits in the Remodel
On a full kitchen remodel, the permit is one of the smallest lines and one of the first: nothing inside a wall gets covered before its inspection. A licensed general contractor applies for it, and we pull ours in Doral under Florida license CGC1524886. If you have a quote with a permit line on it, bring it to our office at 8200 NW 41st St, Suite 200-4, Doral, FL 33166, and we will check it against the city's schedule.
Frequently Asked Questions
How much does a building permit cost in Florida?
There is no statewide price. Each city or county building department sets its own schedule, and state law ties the fees to what the service costs. Florida adds 2.5% of the base fee for two state building code agencies, and on Doral permits Miami-Dade adds a 5% surcharge.
Who pays for the permit on a kitchen remodel?
The licensed contractor applies for the permit under its own license, and the contract says who pays the fee. Since July 1, 2026, Florida law bars the city from asking for a copy of that contract, or its labor and material costs, before it issues the permit.
Can you get a refund on a Doral permit if the remodel is cancelled?
Mostly, if nothing has been built. Doral refunds the permit, less the intake fee, when the request comes in writing before the permit expires and no inspection has been recorded. Fees of $200 or less are not refunded, and the city charges $103.73 for a verification trip.
Start With the Scope
Tell us what the kitchen needs, from the layout to which trades it touches, and we can tell you which permits it will take before we price anything else. Call (786) 397-8380, Monday through Friday from 7:00 AM to 10:00 PM. If you already have plans or another contractor's quote, bring them by our office at 8200 NW 41st St, Suite 200-4, Doral, FL 33166, or email photos to info@gavenconstructions.com.