Bathroom Remodeler Miami, FL

Bathroom remodeler Miami, FL: we run full bathroom remodels from our Doral office, waterproofing, permits, and inspections included.

Bathroom remodeler Miami: finished bathroom with a gray shaker vanity and marble top, a frameless glass shower, white subway tile, and a freestanding tub
A finished Miami bathroom
Florida Certified General ContractorCGC1524886
Projects since 2015500+
Homeowner reviews5.0 ★ Google
Operating fromDoral, Florida

Your bathroom has had enough. The grout is stained, the shower leaks into the next room, or a past contractor left the job half done. If you want the whole bathroom rebuilt, waterproofed, permitted, and inspected by one licensed bathroom remodeler, you are in the right place. Waiting rarely saves money: water behind tile keeps spreading until someone opens the wall.

The problem you came with

What Bathroom Problems Bring Miami Homeowners to Us?

Most calls to a bathroom remodeler in Miami start with one of four problems.

01

Water got behind the tile.

A failed shower pan or a cracked grout line lets water into the wall and the floor. In Miami's humidity it does not dry out, so you see loose tile, a soft spot by the toilet, or mold along the baseboard. Regrouting does not fix a pan that has already failed.

02

The bathroom no longer fits how you live.

A tub nobody uses, a step-in shower that is hard on your knees, or one small sink for two people. Changing that means moving drains, supply lines, and wiring. That is a full remodel, not a refresh.

03

Something forced the job.

Old galvanized pipes, an unpermitted bathroom that showed up at sale, or insurance work after a leak can all turn into a bathroom rebuild.

04

A past contractor took the deposit and stalled.

Florida law covers this. In most cases, a contractor who takes more than 10 percent of the price up front on a home job must apply for permits within 30 days and start within 90 days of getting them, unless you agreed in writing to more time (Florida Statutes §489.126).

Doing it yourself rarely holds up here. Moving a drain, adding a circuit, or rebuilding a shower pan needs a permit and an inspector's sign-off, which is why a licensed bathroom remodeler pulls one.

On the public record

Our Bathroom Work, on the Public Record

Our permits are public. Look up the number below with the City of Miami, or read our full permit history as a bathroom remodeler and general contractor on BuildZoom.

Miami 33137 · Condo unit
Permit BD18-006541 · City of Miami · Final

Bathroom, kitchen, and laundry remodel inside a condo unit: wood, laminate, and tile floors, new cabinets, and soffit repairs, permitted and closed out with the City of Miami.

Permit history · BuildZoom
37+ permitted projects on record

Every permitted job we have closed as a bathroom remodeler and general contractor shows up on BuildZoom, which pulls from public building records. Many bathroom remodels fall under permit thresholds, so the record shows only part of our work.

What a full remodel includes

Our Bathroom Remodeling Services

A full bathroom remodel is several trades in a small room, on one schedule, and your bathroom remodeler runs all of them. Here is what each part involves, and where to read more.

It starts with the shower, because that is where water does damage. Walk-In Shower Installation covers the shower pan, the slope to the drain, the waterproof membrane, curbless entries, and the glass. If you want a tub instead, or both, Bathtub Installation covers floor support for a heavy tub, setting it level, and the drain and overflow. When the tub body is sound and only the surface is worn, Bathtub Reglazing explains when a new coating holds and when it does not.

Then the surfaces. Bathroom Tile Installation covers floor and wall tile: a flat base for large tiles, grout, and floors that are not slippery when wet. Bathroom Vanity Installation covers single and double vanities, the wall support a floating vanity needs, and reconnecting the sink.

Behind the walls is where inspections happen. Bathroom Plumbing Installation covers supply lines, drains, and venting, and what it takes to move a toilet or a shower. Bathroom Electrical Installation covers GFCI protection near water, a dedicated circuit, the exhaust fan, and lights rated for wet areas. Both are permitted and inspected.

One bathroom remodeler, one contract: we do all of this as one full remodel. We do not take single-trade jobs like a vanity swap or a tile repair.

Doral and Miami

Bathroom Remodeler for Doral and Miami Homes

Finished bathroom with a gray double vanity and stone top, a freestanding tub under a window, a glass shower with gray subway tile, and wood shelves

Our office is at 8200 NW 41st St, Suite 200-4, Doral, FL 33166. From there we work as a bathroom remodeler across Miami-Dade, Broward, and Palm Beach County. Most of our work sits between Aventura and Coral Gables, with Doral, Miami Springs, Tamiami, and Pinecrest in between.

Your address decides who issues the permit. Doral is its own city, with its own building department and online permit system. Coral Gables and Miami Beach run their own too. A home outside any city line goes through Miami-Dade County instead. Each city in the county has its own building official for permits and inspections (Miami-Dade County). We pull the permit in our name with whichever office covers your home.

Finished bathroom with two floating stone vanities, a freestanding tub under a window with a water view, and a frameless glass shower with a linear drain

Your building changes the work. In a single-family home we can usually reach the plumbing from the slab or the attic and vent the fan straight outside. Condo towers add board approval, freight elevator bookings, set work hours, and a water shutoff that may cover more than your unit. Many towers also limit cutting into the concrete slab, which decides where a drain can go. We plan those into the schedule from day one.

Water decides the rest. Every new shower gets a waterproof membrane under the tile, tested before the tile goes on, because grout alone is not waterproof. If your home is in a flood zone, a bathroom alone rarely gets near FEMA's 50% substantial-improvement rule, but a bathroom inside a larger remodel can, and we check that before design.

What it costs

What a Bathroom Remodel Costs in Miami in 2026

We publish our prices so you can compare us with any bathroom remodeler in Miami before you call. There are four tiers. Each one is a full remodel, permitted, with its own timeline.

Guest bathroom with a white shaker vanity, a round mirror, and a gray tile shower behind a sliding glass door
Tier 01
Standard Full Bathroom
$8.5K–$15K3–5 weeks

A guest or hall bathroom rebuilt in full: stock vanity, porcelain tile, a tub-shower or basic glass shower, new fixtures, and plumbing kept in place.

Schedule consultation →
Bathroom with a floating gray vanity, white subway tile, a frameless glass shower, and a freestanding tub
Recommended
Tier 02
Mid + Elevated
$15K–$30K5–7 weeks

A primary or large second bathroom: semi-custom vanity, frameless glass, large-format porcelain, a waterproof membrane system, and better fixtures.

Schedule consultation →
Bathroom with a wood floating vanity and stone top, a freestanding tub, and a glass shower panel with black fixtures
Tier 03
Luxury Full Bathroom
$30K–$50K7–11 weeks

Natural or sintered stone, a curbless shower with a linear drain, a freestanding tub, a custom vanity, and the layout changed where needed.

Schedule consultation →
Bathroom with a marble-top floating vanity, a walk-in glass shower with a lit niche, and a freestanding tub
Tier 04
Primary-Suite Luxury
$50K–$100K+9–13 weeks

A full primary suite: book-matched stone, a steam shower, heated floors, custom millwork, and walls moved.

Schedule consultation →
Tier 02 fits most full bathroom remodels in Miami. The shower is usually the biggest single cost, because the pan, the membrane, and the glass all live there. Plan 10 to 20 percent extra for what demolition uncovers behind old tile. No build runs longer than 13 weeks.
Our process

How Your Bathroom Remodel Runs, Start to Finish

01
Discovery and design
Up to 1 week

We visit, measure, and photograph the bathroom. For a condo, we pull the building's renovation rules before drawing anything.

02
Permits and selections
2–3 weeks

We file with your city or the County. Tile, vanity, glass, and fixtures get ordered now, so lead times do not stall the build.

03
Demolition and rough-ins
1–2 weeks

The old bathroom comes out down to the studs and slab. New plumbing, wiring, and the fan duct go in and get inspected before the walls close.

04
Waterproofing and tile
1–8 weeks

Shower pan, membrane, a flood test, then tile, tub, and vanity. This is the longest phase, and its length depends on your tier.

05
Fixtures and finishes
1–2 weeks

Glass, faucets, toilet, mirrors, lights, and paint. Final inspections start here.

06
Walk-through
Up to 1 week

Punch list, final sign-offs, permit closed, and warranties registered in your name.

Phases 3 to 6 are the build: 3 weeks for a Tier 01 bathroom, 13 weeks at most for Tier 04.

Why Gaven

Why Choose Gaven as Your Bathroom Remodeler

01

You can check our license.

Florida Certified General Contractor, license CGC1524886. Look it up on MyFloridaLicense.com before you sign with any bathroom remodeler, us included.

02

The price is in writing first.

Tier, scope, and timeline are in the contract before you sign. The visit and the quote are free, with no trip fee.

03

We test the shower before the tile.

The pan and the membrane get a flood test before any tile goes on, so a leak shows up while it is still cheap to fix.

04

A written warranty.

1 to 2 years on labor, plus the manufacturer warranties on fixtures, stone, and the waterproofing system.

05

Full bathrooms only.

We work as a bathroom remodeler for full rebuilds. If you need one small repair, we will tell you who to call instead.

CGC1524886License · Credential

Licensed and Permitted in Miami-Dade, Broward, and Palm Beach County

Gaven Constructions has worked as a Miami bathroom remodeler since 2015 and holds Florida Certified General Contractor license CGC1524886. Hundreds of projects since 2015 · 37+ BuildZoom-verified permits. The two numbers differ for a simple reason: many bathroom remodels in South Florida fall under permit thresholds, so only part of our work appears in the public permit record.

CGC1524886License
2015Operating since
37+ BuildZoom-verifiedPublic permits
5.0 ★Google reviews
Reviews

What Miami Homeowners Say

Live reviews loading from Gaven's Google Business Profile.

The full 5.0-star rating, all 60+ reviews, and the firm's response history are visible directly on Google.

View on Google →
Watch

The Waterproofing Truth, on Video

Why the layer under the tile matters more than the tile, and what to ask any bathroom remodeler about it before you sign.

FAQ

Questions About Your Miami Bathroom Remodel

QHow much does a bathroom remodel cost in Miami?

A full bathroom remodel with us runs from $8.5K to $100K+, in four tiers. Tier 01 is $8.5K–$15K for a guest or hall bathroom, Tier 02 is $15K–$30K, Tier 03 is $30K–$50K, and Tier 04 starts at $50K for a full primary suite. Most Miami bathrooms land in Tier 02. Plan 10 to 20 percent extra for what demolition uncovers.

QHow long does a bathroom remodel take in Miami?

The build runs 3 to 5 weeks for a guest bathroom and never more than 13 weeks, even at Tier 04. Design and permits come first and take 3 to 4 weeks. In a condo tower, we plan board approval and elevator time in before the build starts.

QDo I need a permit to remodel my bathroom in Miami?

Yes, if you move plumbing, add or change wiring, rebuild the shower pan, or touch a wall. Which office issues it depends on your address: a home in Doral goes to the City of Doral, and a home outside any city goes to Miami-Dade County. We pull every permit in our name.

QHow much should I pay a bathroom remodeler up front in Florida?

Ask for the payment schedule in writing before you sign. Under Florida law, a contractor who takes more than 10 percent up front on a home job must, in most cases, apply for permits within 30 days and start within 90 days of getting them. If a contractor takes a large deposit and stalls, that law is on your side.

QCan you turn a tub into a walk-in shower in a Miami condo, and why does it take longer than in a house?

Yes. A condo takes longer for three reasons. The board has to approve the plans, usually in 2 to 6 weeks. Crews can only work set hours and must book the freight elevator. And many towers limit cutting into the concrete slab, which decides whether the new shower can be curbless and where its drain goes. We sort all three out before demolition, so the build itself stays inside our tier timelines.

QCan I use another bathroom while you remodel one?

Yes, and most families do. Only the bathroom we are working on is shut down. Water to the rest of the house stays on except for short shutoffs while we tie in new lines, and we tell you about each one in advance.

QDo you charge to come look at my bathroom?

No. The site visit, the scope talk, and the written quote are free, with no trip fee. You pay nothing until work begins, and the price is in the contract before you sign.

QHow do you keep a new shower from leaking in Miami's humidity?

Grout and tile are not waterproof, so the protection goes underneath. We build the pan with a slope to the drain, cover the shower walls and floor with a waterproof membrane, and flood test it before any tile goes on. Then an exhaust fan ducted outside, which the Florida Building Code requires in a bathroom without a window that opens, pulls the moisture out after every shower.

QHow do I check that a bathroom remodeler in Miami is licensed?

Look up the license number at MyFloridaLicense.com. Ours is CGC1524886. Then check the permit history on BuildZoom and read the Google reviews. Do all three before you sign with anyone.

QWill a bathroom remodel in a Miami flood-zone home trigger FEMA's 50% rule?

A bathroom on its own rarely does. The rule applies when the cost of the work passes half the value of the building. A bathroom inside a larger remodel, or several bathrooms at once, can get there, so we check your flood zone and the numbers during design.

Being a bathroom remodeler is one part of what we do. For additions, whole-home remodels, and new construction, see our work as a Miami general contractor.

Ready to start?

Free Quote. No Trip Fee. No Pressure.

Call us or send the form. As your bathroom remodeler, we will visit, walk through the scope and the tier with you, and put a written proposal in your hands at no charge. Our office is at 8200 NW 41st St, Suite 200-4, Doral, FL 33166, open Monday to Friday, 7:00 AM to 10:00 PM.

Call the office direct
(786) 397-8380
Monday–Friday, 7:00 AM – 10:00 PM · Same-business-day response
✓No trip fee, everThe site visit and the written quote are free.
✓Price in the contract before signingTier, scope, and timeline, all three up front.
✓Full bathroom remodels onlyIf it's partial work, we'll point you to the right trade.
LicenseCGC1524886
ServingMiami-Dade, Broward, and Palm Beach County
HoursMonday–Friday, 7:00 AM – 10:00 PM